Dr. Azizuddin Bin Abd Aziz

 azizuddin@umpsa.edu.my

 094315424

IJAZAH KEDOKTORAN (DOCTORAL DEGREE)(2015)

Kejuruteraan Mekanikal / Jentera

Kyushu University, Japan


IJAZAH SARJANA (MASTERS DEGREE)(2005)

Kejuruteraan Mekanikal / Jentera

Universiti Putra Malaysia


IJAZAH SARJANA MUDA (BACHELOR DEGREE)(1997)

Kejuruteraan Mekanikal / Jentera

Universiti Teknologi Malaysia, Skudai





Biography


Dr Azizuddin Abd Aziz was in the oil and gas industry before he joined the Faculty of Mechanical Engineering, Universiti Malaysia Pahang. As a project engineer, his responsibilities were to supply, commission and service the boiler and cooling tower feedwater system to downstream facilities. In the field of academic, his interest in research are in the fields of air conditioning system and building energy consumption. As a member of the Energy Sustainability Focus Group in the faculty, he concentrates on the effort to reduce energy usage for a greener earth.



Current Progress



Expertise


Wind Turbine

Flow Analysis

HIGH

Building Energy, Dehumidification

Energy Conservation In Air-Conditioning

HIGH

No Code Subject
1 BMM4912 FINAL YEAR PROJECT 1
2 BMM4924 FINAL YEAR PROJECT 2
3 BMM2253 FLUIDS MECHANICS
4 BMM4824 UNDERGRADUATE RESEARCH PROJECT 2
5 BMA4924 FINAL YEAR PROJECT 2
6 BMM2263 ADVANCED FLUIDS MECHANICS
7 BMM2533 FLUIDS MECHANICS 1
8 BMA4812 UNDERGRADUATE RESEARCH PROJECT 1
9 BMM2543 FLUIDS MECHANICS 2
10 BMA4912 FINAL YEAR PROJECT 1
11 BMM4812 UNDERGRADUATE RESEARCH PROJECT 1
12 DMM2533 FLUIDS MECHANICS
13 BMA4824 UNDERGRADUATE RESEARCH PROJECT 2
14 BMM3531 ENGINEERING THERMODYNAMICS LAB
15 BVA3314 FINAL YEAR PROJECT 1
No. Title Role Start Date End date Agency Grant Amount(RM) Status
1 Heat Dissipation Performance Of Fin Fiber Reinforced Polymer Heat Exchanger Leader 01-SEP-2023 31-AUG-2025 GERAN DALAM 24,000.00 On-Going
2 Mathematical Modelling To Predict The Drag Force Behavior Of Vertical Axis Wind Turbine Blades For Energy Harvesting Enhancement Leader 01-SEP-2019 31-MAY-2022 FRGS 66,200.00 -
3 Development Of Moulds For Polymer Gears In Automotive Applications Leader 25-APR-2018 24-JUL-2020 GERAN DALAM 26,000.00 -
4 Experimental Analysis On The Performance Of Condenser Waste Heat And Thermal Assisted Desiccant Wheels Dehumidifier For Split Type Air-Conditioner Leader 25-MAY-2017 24-MAY-2019 GERAN DALAM 23,750.00 -
5 Humidity Controlled Air-Conditioning System Using Solar Desiccant Cycle For Energy Savings In Tropical Climate Leader 15-DEC-2015 14-DEC-2016 SEED MONEY 5,500.00 -
6 Pristine Blade Characteristics Concept Emphasizing Mathematical Model Optimization Of Floating Undershot Wheel For Picohydropower Generators Leader 01-JUL-2014 30-JUN-2017 FRGS 100,000.00 -
7 Development Of Heat Removing System Using Blower Dual Rotation For Passenger Car Leader 01-MAY-2009 30-APR-2010 GERAN DALAM 30,000.00 -
8 Performance Of Split-Unit Air Conditioning System Using Refrigerant R32 And Pve/Nanolubricant Member 20-DEC-2021 19-DEC-2023 PENERBITAN ANTARABANGSA 40,000.00 -
9 Formulation Of Mathematical Model To Predict Flow-Induced Fiber Orientation In Fiber Reinforced Polymer Heat Exchangers For Enhanced Thermal Dissipation Member 01-SEP-2019 31-MAY-2022 FRGS 87,965.00 -
10 Wind Tunnel Experimental Study On Aerodynamic Interaction Between Rough Wall Boundary Layer With Wake Behind Vortices Generators Member 15-AUG-2019 14-NOV-2021 GERAN DALAM 36,500.00 -
11 Development Of Correlations For Low Cost And Light Weight Carbon Reinforced Polymer Composite Heat Exchangers Member 01-APR-2019 30-JUN-2021 GERAN DALAM 33,000.00 -
12 Enhancement Of High-Temperature Compressed Gas Cooling Process Using Vortex Tube Through Geometrical Parameters Modification Member 15-AUG-2017 14-AUG-2019 FRGS 73,750.00 -
13 Performance Analysis Of Automotive Air Conditioning (Aac) System Using Lower Global Warming Potential (Gwp) Refrigerant-R1234yf Operating With Nanolubricants Member 25-JUN-2016 24-JUN-2018 GERAN DALAM 36,000.00 -
14 To Develop And Optimize The Geometrical Parameters Of Vortex Tube Cooling Device Member 25-MAY-2016 24-MAY-2018 GERAN DALAM 28,000.00 -
No Project Customer Start Date End Date Project Amount (RM)
No Type Name Registration No File Date
1 Patent Dw
No Description

* Data sehingga 11 April 2019

No Professional Bodies (Association/Other Association) Start Date End Date Level
1 MALAYSIA BOARD OF TECHNOLOGIST (MBOT) 21/07/2024 20/07/2025 null