Profesor Madya Dr. Doh Shu Ing

 dohsi@umpsa.edu.my

 094316210

IJAZAH KEDOKTORAN (DOCTORAL DEGREE)(2012)

Kejuruteraan Awam

Universiti Malaysia Sabah


IJAZAH SARJANA (MASTERS DEGREE)(2005)

Kejuruteraan Awam

Universiti Malaysia Sabah


IJAZAH SARJANA MUDA (BACHELOR DEGREE)(2000)

Kejuruteraan Awam

Universiti Malaysia Sabah





Biography


Dr Doh is driven by the to “think global but act local”. He obtained PhD in Civil Engineering (2012) from Universiti Malaysia Sabah (UMS). He holds different industrial positions ranging from site engineer to contract manager in his 5 years construction experience. Currently, he is an Associate Professor in the Faculty of Civil Engineering Technology, Universiti Malaysia Pahang (UMP).

He has strong passion in research work and secured over 30 local and international projects. To date, he has published over 100 reputable journals and  actively provides consultation and training programs for the government and private agencies.

 

 



Current Progress



Expertise


Concrete Material

Community Development

HIGH

Sustainable Material

Construction Materials

HIGH

Construction Material

Environmentally Sustainable Construction

VERY HIGH

Ibs System

Construction Techniques

HIGH

Concrete Structure

Civil Engineering

VERY HIGH

Construction Management

Construction

HIGH

No Code Subject
1 BAA3012 LAW OF CONTRACT & ESTIMATION
2 KUK4412 PROJECT MANAGEMENT
3 DRA2023 PROJECT MANAGEMENT
4 UIR1113 Research Methodology for Engineering, Science and Technology
5 BAA3922 RESEARCH METHODOLOGY & PRE - PROJECT
6 BET3522 PROCUREMENT FOR INFRASTRUCTURAL PROJECT
7 BAA4914 FINAL YEAR PROJECT
8 BAA3413 LAW OF CONTRACT AND ESTIMATION
9 BAA3023 PROJECT MANAGEMENT IN CONSTRUCTION
10 BAA1931 ENGINEERING LABORATORY I
11 BAA4023 PROJECT FOR PROFESSIONAL PRACTICES
12 DAA2023 PROJECT MANAGEMENT
No. Title Role Start Date End date Agency Grant Amount(RM) Status
1 The Modelling On The Effect Of Elevated Temperature To The Mechanical Properties Of Steel Slag Mortar (Ssm) Leader 01-OCT-2021 30-SEP-2023 GERAN DALAM 31,500.00 -
2 A Study On The Sustainable Universal Building Design For Aging Community In Malaysia Leader 01-SEP-2021 31-AUG-2023 MADE IN UMP 58,080.00 -
3 Elucidation Of Lightweight Concrete Sleeper Using Oil Palm Shell And Steel Slag For Railway Application Leader 26-JUN-2020 25-JUN-2023 PGRS 4,300.00 -
4 A Comprehensive Study On Cost Overrun In Jordanian Construction Project Leader 15-OCT-2019 14-OCT-2022 PGRS 4,150.00 -
5 Prevalent Issues And Key Readiness Parameters Of Highway Construction Leader 15-OCT-2019 26-FEB-2020 PGRS 3,150.00 -
6 Influence Of Quantificaytion Factors Of Road Damages In Relative Important Index (Rii) In Jeram, Kuala Selangor Leader 15-MAR-2019 14-MAR-2021 PGRS 2,500.00 -
7 Managiing Risk In Construction Projects In Developing Countries Case Of Yemen Leader 15-MAR-2019 14-MAR-2021 PGRS 3,500.00 -
8 A Study On Role Of Eggshell Powder And Fly Ash In The Hydration Activity Of Blended Cement Leader 01-JAN-2019 30-SEP-2021 FRGS 79,000.00 -
9 Elucidation Of Blended Cement Using Industrial Waste Leader 15-JUN-2017 14-JUN-2019 GERAN DALAM 24,500.00 -
10 The Use Of Natural Carbonate As Additive In Sewage Sludge Concrete Leader 01-MAY-2016 30-APR-2018 PGRS 3,000.00 -
11 The Building Effects Of Sewerage Sludge Ash (Ssa) As Partial Cement Replacement In Concrete Leader 01-DEC-2014 30-NOV-2016 GERAN DALAM 28,000.00 -
12 A Novel Bim-Based Circular Infrastructure Lifecycle Framework Using R-Principles To Ensure Sustainable Construction In Malaysia Member 01-AUG-2024 31-JUL-2026 FRGS 66,000.00 On-Going
13 Elucidation Of Plant-Based Ash As Partial CementReplacement Sustainable Concrete Member 15-NOV-2022 14-NOV-2024 PENYELIDIKAN UNGGUL 50,000.00 On-Going
14 Investigation Of Pozzolanic Activity Of Waste Ash Material Member 01-SEP-2022 31-AUG-2024 PADANAN UNIVERSITI 20,000.00 -
15 Multicriteria Decision Model To Evaluate Project Execution Risk Rating For Road Construction Project Member 01-SEP-2021 31-AUG-2023 GERAN DALAM 27,500.00 -
16 Aquaponics System Using Effuent From Sewage Treatment Plant In Ump Member 01-NOV-2019 31-JAN-2022 GERAN DALAM 25,500.00 -
17 Degradation Modelling For Composite Repaired Pipe Member 01-OCT-2019 31-DEC-2021 PADANAN AGENSI 20,000.00 -
18 A Study On The Relationship Between Providing Information In Foreign Worker Native Language And Construction Project Success Member 10-MAY-2019 09-AUG-2021 GERAN DALAM 26,500.00 -
19 Developing An Assessment Tool For Construction Readiness For Structured Decision Making Member 01-MAY-2019 30-JUL-2021 GERAN DALAM 25,500.00 -
20 Formulation Of Model To Assess The Failure Of Rock Slope Member 01-MAY-2019 30-JUL-2021 GERAN DALAM 34,500.00 -
21 Geotechnical Characterisation Of Bauxite Deposits In The Kuantan For Civil Engineering Work Purposes Member 25-OCT-2018 24-JAN-2021 GERAN DALAM 36,000.00 -
22 Assessment Of Nanosilica Concentrations Towards The Microstructural Changes Of Nanosilica Modified Asphalt Binder Member 25-SEP-2018 24-DEC-2020 GERAN DALAM 27,500.00 -
23 Study Of Permanent Stabilization Project For Rock Slope At Jelapang,Km 258.17.South Bound, Section N5(Ipoh) And Bukit Lanjan, Section C4 And Site Investigation Project Using Electrical Resistivity Survey At Jabatan Taman Laut Malaysia,Pulau Aur Mersing Johor Member 18-JUL-2018 17-JUN-2019 CONTRACT RESEARCH PROJECT 21,000.00 -
24 Steel Reinforcement Replacement Using Natural Fiber Mat Member 05-MAY-2018 04-MAY-2020 GERAN DALAM 30,000.00 -
25 Structural Behaviour Of Rc Beams With Openings Strengthened With Bfc Plates Member 05-APR-2018 04-APR-2020 GERAN DALAM 36,000.00 -
26 Identification Of Bamboo Species In Malaysia For Applications In Concrete Reinforcement Or Bamboo Reinforced Concrete And Other Applications Member 08-JAN-2018 07-JUN-2018 CONTRACT RESEARCH PROJECT 42,717.43 -
27 Utilising Of Palm Oil Frond As Replacement Of Aggregate For Sustainable Non Load Bearing Construction Material For Residential Buildings Member 20-SEP-2017 19-SEP-2019 GERAN DALAM 29,500.00 -
28 Behavior Of Perforated Cold-Formed Steel I-Shaped Open Section With Edge And Web Stiffeners Member 30-JUN-2017 29-JUN-2019 GERAN DALAM 21,000.00 -
29 Mechanical Properties Of Carbon-Based Epoxy Grout As Infill Material For Steel Pipeline Repair Member 30-JUN-2017 29-JUN-2019 GERAN DALAM 25,000.00 -
30 Kajian Penyediaan Pelan Pengurusan Lemabangan Sungai Bersepadu (Irbm), Sungai Kuantan, Pahang Di Bawah Perlaksanaan Jps Malaysia Member 14-FEB-2017 31-DEC-2018 CONTRACT RESEARCH PROJECT 499,246.19 -
31 Elucidation On The Effect Of External Strengthening Technique By Bamboo Fiber Composite To The Mechanical Properties And Durability Of Rc Beams With Openings In The Shear Zones Member 01-DEC-2015 30-NOV-2017 RAGS 58,150.00 -
32 Earthquake Resistance And Structure Performance For Malaysia Region Member 01-DEC-2014 30-NOV-2016 GERAN DALAM 27,700.00 -
No Project Customer Start Date End Date Project Amount (RM)
No Type Name Registration No File Date
1 Patent A Novel Concrete Mixture And Method Preparing The Same 2017400012 20-JUN-2017
No Description

* Data sehingga 11 April 2019

No Professional Bodies (Association/Other Association) Start Date End Date Level
1 BOARD OF ENGINEERS MALAYSIA (BEM) 01/01/2022 31/12/2022 null
2 THE INSTITUTION OF ENGINEERS, MALAYSIA (IEM) 01/01/2024 31/12/2024 NEGERI
3 THE INSTITUTION OF ENGINEERS, MALAYSIA (IEM) 01/01/2024 31/12/2024 null