1 |
Development Of Intelligent Computational Tool To Optimize Student Academic Load |
Leader |
01-DEC-2023 |
30-NOV-2025 |
PENGAJARAN DAN PEMBELAJARAN |
21,500.00 |
On-Going |
2 |
An Improved Arithmetic Optimization Algorithm For Cost-Based Hybrid Flowshop Optimization |
Leader |
15-JUL-2023 |
14-JUN-2026 |
PGRS |
2,400.00 |
On-Going |
3 |
Modeling And Optimization Of Cost-Based Hybrid Flowshop Scheduling In Automotive Component Production |
Leader |
15-NOV-2022 |
14-NOV-2024 |
PENYELIDIKAN UNGGUL |
39,800.00 |
- |
4 |
Formulation Of A Combinatorial Permutation-Based Metaheuristic Algorithm To Optimize Energy Utilization In Assembly Line |
Leader |
01-SEP-2019 |
31-MAY-2022 |
FRGS |
67,200.00 |
- |
5 |
Energy Utilization Modelling And Optimization For Machine Scheduling Problem In Production |
Leader |
01-APR-2019 |
30-JUN-2021 |
GERAN DALAM |
23,500.00 |
- |
6 |
Modelling And Optimization Of Assembly Sequence Planning For Automotive Subassembly |
Leader |
05-APR-2018 |
04-JUL-2020 |
GERAN DALAM |
28,000.00 |
- |
7 |
Optimization Of Assembly Sequence Planning Using Ant Colony Optimization Algorithm |
Leader |
01-MAR-2017 |
01-MAR-2019 |
PGRS |
3,000.00 |
- |
8 |
Modelling And Optimization Of Mixed Model Assembly Line Problem With Resource Constraints |
Leader |
01-MAR-2017 |
01-MAR-2019 |
PGRS |
2,500.00 |
- |
9 |
Optimization Of Double Sided Assembly Line Balancing With Resource Constraints |
Leader |
01-MAR-2017 |
01-MAR-2019 |
PGRS |
2,500.00 |
- |
10 |
Modeling And Optimization Of Multi-Holes Drilling Path Using Particle Swarm Optimization |
Leader |
25-MAY-2016 |
24-MAY-2018 |
GERAN DALAM |
30,500.00 |
- |
11 |
Multi-Objective Optimisation Of Simple Assembly Line Balancing Type-E |
Leader |
15-MAR-2015 |
14-MAR-2017 |
PGRS |
3,000.00 |
- |
12 |
Modelling And Optimization Of Assembly Line Balancing With Multi-Resource Constraints |
Leader |
01-JUL-2014 |
30-JUN-2017 |
FRGS |
117,600.00 |
- |
13 |
Modeling And Optimization Of Automotive Manufacturing Layout To Enhance Productivity |
Leader |
01-DEC-2013 |
30-NOV-2015 |
GERAN DALAM |
24,000.00 |
- |
14 |
Development Of Low-Cost Pneumatic Controller For Industrial Application |
Leader |
05-JAN-2009 |
30-OCT-2010 |
GERAN DALAM |
25,000.00 |
- |
15 |
Modeling And Optimization Of Energy-Based Hybrid Flowshop Scheduling In Manufacturing Component Production |
Member |
01-SEP-2024 |
31-AUG-2026 |
GERAN DALAM |
29,000.00 |
On-Going |
16 |
Parametric Investigations And Optimization Of Various Flexure Bearing Design Topologies |
Member |
15-DEC-2022 |
14-DEC-2024 |
GERAN DALAM |
39,800.00 |
On-Going |
17 |
Optimisation Of Pi-Pd Controller For Dc Motor Position Of The Linear Conveyor System Using Modified Adaptive Bats Sonar Algorithm. |
Member |
01-OCT-2021 |
30-SEP-2023 |
GERAN DALAM |
28,800.00 |
- |
18 |
Multi-Stage Flow Shops Scheduling With Energy Utilization Using Metaheuristic Optimization For Automotive Component Plant |
Member |
01-APR-2021 |
31-MAR-2023 |
GERAN DALAM |
26,500.00 |
- |
19 |
Ergonomics Automotive Welding Workstation Set-Up Modelling For Musculoskeletal Disorders (Msd) Issues |
Member |
01-SEP-2019 |
31-MAY-2022 |
FRGS |
68,200.00 |
- |
20 |
Improvement Of Energy In Production Lines, Heating Vetilation And Air Condition (Hvac) Integration Systems At Electronics Company (Uic190815) |
Member |
20-MAY-2019 |
17-NOV-2021 |
PADANAN MTUN - INDUSTRI |
52,150.00 |
- |
21 |
Improvement Of Energy In Production Lines, Heating Vetilation And Air Condition (Hvac) Integration Systems At Electronics Company (Rdu192807) |
Member |
20-MAY-2019 |
17-NOV-2021 |
INDUSTRI |
52,150.00 |
- |
22 |
Enhancement Small Medium Enterprise (Smes)Performance Through Integrating Lean Manufacturing (Lm) And Industrial Revolution 4.0 (Ir 4.0) - Automotive Component Industry |
Member |
01-JAN-2019 |
30-SEP-2021 |
FRGS |
54,000.00 |
- |
23 |
Framework Development For Special Purpose Vehicle (Spv) Assembly Line Optimisation Utilising Witness Simulation And Ergonomic Analysis |
Member |
25-SEP-2018 |
24-DEC-2020 |
GERAN DALAM |
21,000.00 |
- |
24 |
Investigation Of Bats Echolocation-Inspired Algorithm To Solve Many Objective Optimisation Problem Of Car Side Impact Design |
Member |
25-APR-2018 |
24-JUL-2020 |
GERAN DALAM |
23,500.00 |
- |
25 |
Robust Supply Chain Risk Management Models To Optimize Total Supply Chain Cost In An Uncertain Environment Through Soft Computing |
Member |
15-APR-2018 |
21-JAN-2020 |
GERAN DALAM |
31,400.00 |
- |
26 |
Optimization Of Biowaste-Diesel Fuel To Improve The Engine Performance And Emission |
Member |
28-JUN-2017 |
27-JUN-2019 |
FLAGSHIP |
25,000.00 |
- |
27 |
Ergonomics Study On Musculoskeletal Disorders (Msd) Related Problems Among Workers In Electronics Assembly Line |
Member |
25-JUN-2016 |
24-JUN-2018 |
GERAN DALAM |
26,000.00 |
- |
28 |
Development Of Knowledge Based Ergonomics Assessment System At Workplace In Automotive Assembly Plan |
Member |
25-JUN-2016 |
24-JUN-2018 |
GERAN DALAM |
21,500.00 |
- |
29 |
Embedded Ergonomic In Design For Assembly Of Automotive Body Sub-Components |
Member |
05-APR-2016 |
04-APR-2018 |
GERAN DALAM |
25,750.00 |
- |
30 |
Investigation Of The Rigidity Of Cocrmo Cellular Structure Fabricated By Selective Laser Melting Process For Potential Dental Applications |
Member |
01-JAN-2016 |
31-DEC-2018 |
RACE |
49,985.00 |
- |
31 |
A Study Of Lean Manufacturing Implementation In Sme - Automotive Component Industry |
Member |
25-JUN-2015 |
24-JUN-2017 |
GERAN DALAM |
20,450.00 |
- |
32 |
New Approach Of Ankle Morphometric Measurements For Total Ankle Arthroplasty (Tar) Design |
Member |
25-OCT-2014 |
24-OCT-2016 |
GERAN DALAM |
23,500.00 |
- |
33 |
Pemindahan Teknologi Sistem Kawalan, Rekabentuk Percetakan Plastik Dan Pengurusan Kejuruteraan Dalam Industri Plastik |
Member |
01-SEP-2014 |
31-AUG-2016 |
KNOWLEDGE TRANSFER PROGRAMME (KTP) |
135,915.00 |
- |
34 |
Peningkatan Produktiviti Pengeluaran Baja Cecair Kilang Iks Melalui Penambahbaikan Sistem Operasi Dan Pengurusan Bahan Mentah |
Member |
15-FEB-2014 |
14-FEB-2016 |
KNOWLEDGE TRANSFER PROGRAMME (KTP) |
117,426.56 |
- |
35 |
Analysis Of Laser-Micromachining Of Silicon For Mems Components |
Member |
01-AUG-2008 |
31-JUL-2009 |
GERAN DALAM |
11,500.00 |
- |
36 |
Development Of A Drum Cutting And Clamping Machine For Industrial Application |
Member |
09-JAN-2007 |
31-AUG-2008 |
GERAN DALAM |
19,000.00 |
- |
37 |
Design & Simulation Of Robotic Welding System For Automotive Manufacturing |
Member |
26-JAN-2004 |
31-JAN-2005 |
FRGS |
62,000.00 |
- |