1 |
The Innovative Integrated Model System Development For The Implementation Of Complex, Broadly Defined And Well-Defined Engineering Problems For Civil Engineering Related Programmes |
Leader |
01-DEC-2023 |
30-NOV-2025 |
PENGAJARAN DAN PEMBELAJARAN |
20,000.00 |
On-Going |
2 |
Microstructure Interaction Mechanism On Blending Process Of Nanomaterial With Asphalt Binder That Governs The Morphology, Rheology, And Mechanical Properties Of Nanomodified Cold Mix Asphalt Mixture |
Leader |
01-OCT-2023 |
30-SEP-2025 |
FRGS |
93,000.00 |
On-Going |
3 |
Formulation Of Physical And Mechanical Characteristics Of Asphalt Mixtures Incorporating Tin Tailing And Iron |
Leader |
15-AUG-2023 |
14-AUG-2025 |
PENERBITAN ANTARABANGSA |
40,000.00 |
On-Going |
4 |
The Assessment Of Nano-Modified Stone Mastic Asphalt With Various External Loads Such As Traffic And Blast Loads |
Leader |
15-JUL-2023 |
14-JUN-2026 |
PGRS |
6,200.00 |
On-Going |
5 |
Near Miss Crash At Intersection |
Leader |
15-JUL-2023 |
14-JUN-2026 |
PGRS |
1,500.00 |
On-Going |
6 |
Pilot Study Of Cold Mix Asphalt (Uic230805) |
Leader |
15-JUN-2023 |
14-DEC-2023 |
PADANAN INDUSTRI |
10,000.00 |
- |
7 |
Pilot Study Of Cold Mix Asphalt (Rdu232403) |
Leader |
01-MAR-2023 |
14-DEC-2023 |
INDUSTRI |
10,000.00 |
- |
8 |
Mechanical Performance Of Concrete Block Pavement Under Various External Loads |
Leader |
01-JUN-2021 |
31-MAY-2024 |
PGRS |
4,200.00 |
- |
9 |
A Study On Competition Issues In Highway Constrution Industry Due To Covid-19 Outbreak |
Leader |
01-JUN-2021 |
31-MAY-2024 |
PGRS |
4,200.00 |
- |
10 |
Performance Evaluation Of Asphalt Mixture Using Image Analysis Approach |
Leader |
10-DEC-2020 |
09-DEC-2022 |
PGRS |
4,000.00 |
- |
11 |
Physical Properties And Chemical Characterisation Of Nanotitanium Modified Asphalt Binder |
Leader |
10-DEC-2020 |
09-DEC-2022 |
PGRS |
3,500.00 |
- |
12 |
Hydraulic And Mechanical Characteristics Of Fiber Reinforced Porous Asphalt Mixture |
Leader |
10-DEC-2020 |
09-DEC-2022 |
PGRS |
2,850.00 |
- |
13 |
Development Of High Durability Asphalt Block Pavement |
Leader |
01-NOV-2020 |
31-OCT-2022 |
PEMBANGUNAN PRODUK |
38,000.00 |
- |
14 |
Assessing Permanent Deformation Of Two-Layer Porous Asphalt (Tlpa) Incorporating Nano-Hybrid Kenaf Fiber |
Leader |
26-JUN-2020 |
25-JUN-2022 |
PGRS |
3,300.00 |
- |
15 |
Modelling Double Layer Porous Asphalt Mixture Incorporating Various Type Of Natural Fibers |
Leader |
01-NOV-2019 |
31-JAN-2022 |
GERAN DALAM |
30,500.00 |
- |
16 |
Microstructure Interaction Mechanism Of Asphalt Binder Incorporating Natural Fibers |
Leader |
01-SEP-2019 |
31-MAY-2022 |
FRGS-RACER |
66,000.00 |
- |
17 |
Assessment Of Nanosilica Concentrations Towards The Microstructural Changes Of Nanosilica Modified Asphalt Binder |
Leader |
25-SEP-2018 |
24-DEC-2020 |
GERAN DALAM |
27,500.00 |
- |
18 |
Investigating The Characteristics Of Hybrid Asphalt Binder And Mixture For Improved Pavement Performance |
Member |
01-SEP-2024 |
31-AUG-2026 |
PENYELIDIKAN UNGGUL |
47,500.00 |
On-Going |
19 |
Investigation The Influence Of Sediment Composition On Nutrient Dynamics, Algal Blooms, And Dissolved Oxygen In Lake Ecosystems |
Member |
01-APR-2024 |
31-MAR-2026 |
GERAN DALAM |
36,200.00 |
On-Going |
20 |
Kajian Lalulintas Di Daerah Cameron Highlands |
Member |
01-JAN-2024 |
30-SEP-2024 |
AGENSI |
198,000.00 |
On-Going |
21 |
The Assessment Of A New Class Ultra-Rapid Hardening Hydraulic Cements |
Member |
01-DEC-2023 |
30-NOV-2025 |
GERAN DALAM |
40,000.00 |
On-Going |
22 |
Formulation Of Interaction Mechanism Of Vermicompost With Gypsum On Bauxite Aggregate Stability And Liquefaction Risk |
Member |
15-OCT-2022 |
14-OCT-2024 |
PENERBITAN ANTARABANGSA |
40,000.00 |
On-Going |
23 |
Kajian Lalulintas Dan Pengangkutan Awam Bandaraya Kuantan |
Member |
15-MAR-2022 |
14-MAR-2023 |
INDUSTRI |
205,882.00 |
- |
24 |
Development Of Blast Load Device To Measure The Pressure For Flexible Pavement |
Member |
01-JUN-2021 |
31-MAY-2023 |
PEMBANGUNAN PRODUK |
36,000.00 |
- |
25 |
Elucidation Of Hydraulic Behavior For Fiber-Reinforced Porous Asphalt Pavement |
Member |
26-FEB-2021 |
25-FEB-2023 |
GERAN DALAM |
33,000.00 |
- |
26 |
A Dynamic Road Pricing Model To Reduce Highway Congestion In Malaysia |
Member |
20-DEC-2020 |
19-DEC-2022 |
AGENSI |
10,000.00 |
- |
27 |
Development Of Iot Geotechnical Data Mapping System For Pahang Uic201503 |
Member |
01-JAN-2020 |
31-MAR-2022 |
PADANAN ANTARABANGSA |
50,000.00 |
- |
28 |
Assessing Mechanical Properties Of Flexible Pavement Under Traffic And Blast Loads |
Member |
30-DEC-2019 |
29-MAR-2022 |
GERAN DALAM |
33,000.00 |
- |
29 |
Formulation Of Model To Assess The Failure Of Rock Slope |
Member |
01-MAY-2019 |
30-JUL-2021 |
GERAN DALAM |
34,500.00 |
- |
30 |
Geotechnical Characterisation Of Bauxite Deposits In The Kuantan For Civil Engineering Work Purposes |
Member |
25-OCT-2018 |
24-JAN-2021 |
GERAN DALAM |
36,000.00 |
- |
31 |
Performance Of Waste Cooking Oil As Bitumen Modifier |
Member |
25-SEP-2018 |
24-DEC-2020 |
GERAN DALAM |
32,000.00 |
- |
32 |
Study Of Permanent Stabilization Project For Rock Slope At Jelapang,Km 258.17.South Bound, Section N5(Ipoh) And Bukit Lanjan, Section C4 And Site Investigation Project Using Electrical Resistivity Survey At Jabatan Taman Laut Malaysia,Pulau Aur Mersing Johor |
Member |
18-JUL-2018 |
17-JUN-2019 |
CONTRACT RESEARCH PROJECT |
21,000.00 |
- |
33 |
Performance-Based Contract (Pbc) For Road Maintenance In Malaysia |
Member |
30-JUN-2017 |
29-JUN-2019 |
GERAN DALAM |
20,000.00 |
- |