Dr. Lee Yong Siang

 leeys@umpsa.edu.my

 null

IJAZAH KEDOKTORAN (DOCTORAL DEGREE)(2020)

Kejuruteraan Awam

Universiti Sains Malaysia


IJAZAH SARJANA MUDA (BACHELOR DEGREE)(2013)

Kejuruteraan Awam

Universiti Malaysia Sarawak





Biography


-

Ts. Dr. Lee Yong Siang is a highly accomplished civil engineering professional, academic and trainer. His diverse background encompasses project management, research, and consultancy. He is a certified trainer, QLASSIC assessor, Circular Economy specialist, and experienced practitioner in both building and infrastructure projects. Currently, he holds the position of Senior Lecturer at Universiti Malaysia Pahang Al-Sultan Abdullah (UMPSA), where he oversees academic programs, research projects, and industry collaborations in the field of civil engineering.

With extensive experience in the construction industry, Dr. Lee has successfully managed various building and infrastructure projects including high-rise building projects. He has demonstrated proficiency in implementing LEAN, SIX SIGMA principles, thereby achieving budget and operational objectives.

As a proactive contributor to industry standards, Ts. Dr. Lee played a pivotal role in developing Malaysia’s inaugural sustainable infrastructure rating tool, INFRASTAR. This initiative was a collaborative effort between the Construction Industry Development Board (CIDB) and research group.

Ts. Dr. Lee possesses a strong proficiency in digital construction tools, risk assessment, and data analysis. He holds certifications as a Professional Technologist (MBOT), QLASSIC Assessor (CIDB), an AutoCAD Certified Associate and registered as graduate engineer (BEM).

His problem-solving abilities and collaborative approach have earned him recognition. He is also multilingual, fluent in English, Malay, and Mandarin.



Current Progress



Expertise


Engineering Management

Civil Engineering

VERY HIGH

No Code Subject
1 BET3644 INFRASTRUCTURAL MANAGEMENT (STUDIO 6)
2 BET4783 FINAL YEAR PROJECT II
3 BET3593 QUALITY PERFORMANCE MANAGEMENT
4 BAA4914 FINAL YEAR PROJECT
5 BET3683 FINAL YEAR PROJECT I
6 KPM1133 LAW AND ETHICS IN PROJECT MANAGEMENT
7 BCA1914 BUILT ENVIRONMENT TECHNOLOGY
No. Title Role Start Date End date Agency Grant Amount(RM) Status
1 A Novel Bim-Based Circular Infrastructure Lifecycle Framework Using R-Principles To Ensure Sustainable Construction In Malaysia Leader 01-AUG-2024 31-JUL-2026 FRGS 66,000.00 On-Going
2 Safety And Health Factors For Construction Sites Of High-Rise Building ProjectIn Malaysia Leader 15-JUL-2023 14-JUN-2026 PGRS 2,400.00 On-Going
3 Priority Importance Of Social Circular Economy Indicators For Infrastructure Construction Projects Leader 25-DEC-2022 24-DEC-2024 PENYELIDIKAN SAINS SOSIAL 30,500.00 On-Going
4 Formulating An Effective Risk Communication Model For Large-Scale Underground Infrastructure Projects Leader 15-JUL-2022 14-JUL-2024 GERAN DALAM 30,500.00 -
5 Renewable Energy Project Evaluation In Malaysia And Oman: A Decision-Making Trial And Evaluation Laboratory (Dematel) Based Framework (Uic241549) Member 01-DEC-2024 30-NOV-2026 PADANAN ANTARABANGSA 25,000.00 On-Going
6 Renewable Energy Project Evaluation In Malaysia And Oman: A Decision-Making Trial And Evaluation Laboratory (Dematel) Based Framework (Rdu242747) Member 01-DEC-2024 30-NOV-2026 ANTARABANGSA 25,000.00 On-Going
7 The Development Trade-Level Productivity Measuring Tool For Building Construction Projects Member 01-JAN-2023 30-JUN-2023 INDUSTRI 27,360.00 -
8 Formulating An Interrelationship Model Of Digital Twin Readiness Criteria For Bim-Based Construction Projects Member 25-DEC-2022 24-DEC-2024 GERAN DALAM 40,000.00 On-Going
9 Formulating An Interrelationship Model Of Digital Leadership Factors And Strategies In Built Environment Member 25-DEC-2022 24-DEC-2024 PENYELIDIKAN SAINS SOSIAL 40,000.00 On-Going
10 Formulating A Decision Model Of Trust Among The Parties In Digital Construction Member 25-DEC-2022 24-DEC-2024 PENYELIDIKAN SAINS SOSIAL 24,900.00 On-Going
11 Development Of Flood Vulnerability Index (Fvi) UsingAnalytical Hierarchy Process (Ahp) For Kuantan RiverBasin, Malaysia Member 15-DEC-2022 14-DEC-2024 PENERBITAN ANTARABANGSA 40,000.00 On-Going
12 From Bim To Digital Twins: Assessment Of OrganizationalReadiness Member 15-DEC-2022 14-DEC-2024 PENERBITAN ANTARABANGSA 35,000.00 On-Going
13 Kajian Terhadap Tahap Penggunaan Building Information Modelling (Bim) Dalam Industri Pembinaan 2021 Member 17-JUN-2022 16-JAN-2023 INDUSTRI 20,000.00 -
No Project Customer Start Date End Date Project Amount (RM)
No Type Name Registration No File Date
No Description

* Data sehingga 11 April 2019

No Professional Bodies (Association/Other Association) Start Date End Date Level