1 |
Laser Thickness Measuring System For Thin Strip Alloy |
Leader |
25-MAY-2017 |
24-MAY-2019 |
GERAN DALAM |
21,800.00 |
- |
2 |
Simulation And Evaluation Of Assembly Line Balancing In Perodua Manufacturing Plant |
Leader |
15-AUG-2014 |
14-AUG-2016 |
GERAN DALAM |
15,500.00 |
- |
3 |
An Investigation Into Proactive Ergonomics Measures Barriers At Early Product Development Phases In Malaysian Automotive Industries |
Leader |
25-JUN-2013 |
24-DEC-2015 |
GERAN DALAM |
27,300.00 |
- |
4 |
Multi-Objective Genetic Algorithm For Flowshop Scheduling Problem |
Leader |
01-OCT-2012 |
30-SEP-2014 |
GERAN DALAM |
33,600.00 |
- |
5 |
Exploring The Relationship Between Psychosocial Risk Factors And The Musculoskeletal Disorder Symptoms Among Local Cooks |
Member |
25-DEC-2022 |
24-DEC-2024 |
PENYELIDIKAN SAINS SOSIAL |
32,200.00 |
On-Going |
6 |
Optimisation Of Pi-Pd Controller For Dc Motor Position Of The Linear Conveyor System Using Modified Adaptive Bats Sonar Algorithm. |
Member |
01-OCT-2021 |
30-SEP-2023 |
GERAN DALAM |
28,800.00 |
- |
7 |
Forecast Capacity Measurement Model In Academic Organisation |
Member |
01-SEP-2021 |
31-AUG-2023 |
GERAN DALAM |
22,500.00 |
- |
8 |
Costing Improvement Using Time-Driven Activity Based Costing At Academic Library |
Member |
15-NOV-2019 |
14-FEB-2022 |
GERAN DALAM |
22,000.00 |
- |
9 |
Integration Of Core Classification And Cost Reduction Opportunity For Automotive Re-Manufacturing Decision |
Member |
30-APR-2018 |
24-JUL-2020 |
GERAN DALAM |
23,000.00 |
- |
10 |
A New Forecasting Algorithms For Performance Measurement In Manufacturing Industries |
Member |
01-AUG-2016 |
31-JUL-2019 |
FRGS |
81,800.00 |
- |
11 |
Systematic Sustainability Assessment (Ssa) For The Conceptual Design Phase In Malaysia Automotive Industry |
Member |
05-APR-2016 |
04-APR-2018 |
GERAN DALAM |
20,000.00 |
- |
12 |
Systematic Sustainability Assessment (Ssa) Framework Of Automotive-Related Industry In The Malaysia Context |
Member |
01-DEC-2015 |
30-NOV-2017 |
RAGS |
31,000.00 |
- |
13 |
Performance Of Assessment Model For In Situ Design Concept Evaluation Using Integrated Rough-Grey Analysis |
Member |
02-NOV-2015 |
01-NOV-2018 |
FRGS |
84,900.00 |
- |
14 |
Criteria Selection Method In Design Evaluation For Product Development Using Integrated Fuzzy-Ahp |
Member |
15-NOV-2014 |
14-NOV-2016 |
GERAN DALAM |
29,000.00 |
- |
15 |
An Improved Decision Support Tool For Dynamics Job Shop Scheduling |
Member |
15-MAY-2014 |
14-MAY-2016 |
GERAN DALAM |
10,040.00 |
- |
16 |
Single Minute Exchange Die(Smed) Model For Set-Up Time Reduction In Automotive Sector Manufacturing Process |
Member |
01-DEC-2013 |
30-NOV-2015 |
FRGS |
47,000.00 |
- |
17 |
Development Of Decision Model For Implementing Lean Manufacturing Methods Using Topsis And Ahp In Fuzzy Environment |
Member |
01-DEC-2013 |
30-NOV-2015 |
GERAN DALAM |
19,500.00 |
- |
18 |
Statistical Process Control: Fuzzy Control Chart And Process Capability Indices With Normal Data In The Supply Chain Of Automotive Industry |
Member |
01-DEC-2013 |
30-NOV-2014 |
GERAN DALAM |
10,000.00 |
- |
19 |
Fabrication And Properties Of Functionally Graded Materials (Fgms) |
Member |
25-JUN-2013 |
24-JUN-2015 |
GERAN DALAM |
30,500.00 |
- |
20 |
Multi-Mode Failures Modelings In Reliability Engineering Systems With Bayesian Analysis Approach |
Member |
14-JUN-2013 |
14-DEC-2015 |
GERAN DALAM |
25,000.00 |
- |
21 |
The Impact Of Lean Kitting Supply System On Reducing Non Value Added Activates In The Motorcycle Engine Assembly Process |
Member |
01-OCT-2012 |
30-SEP-2014 |
GERAN DALAM |
17,920.00 |
- |
22 |
Development Of Laser Cutting And Engraving Machine Utilising Pc-Nc Controller |
Member |
04-JAN-2007 |
30-MAR-2008 |
GERAN DALAM |
78,000.00 |
- |