1 |
Optimization Of Photovoltaic Distributed Generation In Smart Grid Distribution Network Considering Uncertainty For Power Loss Minimization Based On Fuzzy Embedded Grey-Wolf Optimizer (Fuzzy-Gwo) |
Leader |
01-SEP-2022 |
31-AUG-2024 |
PADANAN UNIVERSITI |
20,000.00 |
On-Going |
2 |
Multi Microgrid Energy Management Using Fuzzy Type 2 Based Predictive Control. |
Leader |
01-APR-2021 |
31-MAR-2023 |
GERAN DALAM |
23,000.00 |
- |
3 |
Energy Saving Control System For Application In Lecture Halls |
Leader |
03-SEP-2007 |
09-FEB-2008 |
GERAN DALAM |
19,500.00 |
- |
4 |
Energy Saving Air-Conditioning Control System |
Leader |
01-AUG-2006 |
31-JUL-2007 |
TANPA PERUNTUKAN |
0.00 |
- |
5 |
Optimal Planning Of Renewable Energy Based Microgrid System Under The Harsh Environment In Horseshoe Island |
Member |
01-JAN-2024 |
31-DEC-2026 |
INDUSTRI |
100,000.00 |
On-Going |
6 |
Whoop Drone Assembly And Piloting For School Students |
Member |
25-DEC-2023 |
24-DEC-2025 |
GERAN INOVASI SOSIAL UNIVERSITI |
20,000.00 |
On-Going |
7 |
Formulation Of A Frequency Domain Analysis As A Minimum Problem Fitness Function For Anomaly Detection In Unmanned Aerial Vehicles |
Member |
01-NOV-2022 |
31-OCT-2024 |
GERAN DALAM |
25,000.00 |
On-Going |
8 |
A Formulation Of Hybrid Monte-Carlo Simulation And Grey Wolf Optimization For Optimal Distributed Generation Placement And Network Reconfiguration In Future Smart Grid Distribution Networks |
Member |
01-SEP-2022 |
31-AUG-2025 |
FRGS |
110,000.00 |
On-Going |
9 |
Online Auto-Tuned Pi Controller Using Pso Algorithm For Dual Active Bridge Dc-Dc Converter |
Member |
01-MAY-2022 |
30-APR-2024 |
GERAN DALAM |
30,000.00 |
On-Going |
10 |
Iot Based Water Quality Prediction System |
Member |
23-DEC-2020 |
22-NOV-2022 |
PEMBANGUNAN PRODUK |
33,000.00 |
- |
11 |
Formulation Of A Minimum Problem Fitness Function For Anomaly Detection In An Underactuated System |
Member |
01-JAN-2019 |
30-SEP-2021 |
FRGS |
57,200.00 |
- |
12 |
The Development Of Robust And Fast Response Control Algorithm For Uav Crop Duster |
Member |
05-OCT-2017 |
04-OCT-2019 |
GERAN DALAM |
20,000.00 |
- |
13 |
Energy Efficient Device For Lighting And Fans |
Member |
01-DEC-2015 |
30-NOV-2016 |
UMP PRE-COMMERCIALIZATION |
69,000.00 |
- |
14 |
Study On Fault Ride-Through (Frt) Capability As A New Requirement In Malaysia Grid Code For Improving Power System Quality And Stability Of Grid Connected Photovoltaic System |
Member |
02-NOV-2015 |
01-NOV-2017 |
FRGS |
82,000.00 |
- |
15 |
Design And Control Flood Drone For Search And Rescue |
Member |
01-DEC-2013 |
30-NOV-2015 |
GERAN DALAM |
24,500.00 |
- |
16 |
The Development And Implementation Of Artificial Intelligence (Ai) Based Autonomous Mobile Object Finder |
Member |
01-AUG-2008 |
31-JUL-2009 |
GERAN DALAM |
16,000.00 |
- |
17 |
Energy Management And Effeciency Program |
Member |
03-SEP-2007 |
03-FEB-2009 |
GERAN DALAM |
20,000.00 |
- |
18 |
Microcontroller-Based Energy Saving Control For Air Conditioning System Using Artifical Intelligence |
Member |
16-NOV-2006 |
15-NOV-2007 |
TANPA PERUNTUKAN |
0.00 |
- |
19 |
Power Line Carrier Power Data Logger |
Member |
01-AUG-2006 |
31-JUL-2007 |
TANPA PERUNTUKAN |
0.00 |
- |