Encik Wan Anuar Bin Wan Hassan
wananuar@umpsa.edu.my
094315397
IJAZAH SARJANA (MASTERS DEGREE)(2014)
Kejuruteraan Mekanikal / Jentera
Universiti Teknologi Malaysia (Skudai)
IJAZAH SARJANA MUDA (BACHELOR DEGREE)(2008)
Kejuruteraan Mekanikal / Jentera
Universiti Malaysia Pahang
Biography
Current Progress
Expertise
No | Code | Subject |
---|---|---|
1 | DRM1721 | MECHANICAL TECHNOLOGY LABORATORY 2 |
2 | DRM1711 | MECHANICAL TECHNOLOGY LABORATORY 1 |
3 | BMM3623 | MECHANICAL DESIGN |
4 | BVA1023 | AUTOMOTIVE DRAFTING |
5 | DMM1413 | ENGINEERING DRAWING & CAD |
6 | BMM1821 | MECHANICAL LABORATORY 2 |
7 | DRM1223 | STATICS |
8 | BTD2133 | STRENGTH OF MATERIALS |
9 | BMM2521 | ENGINEERING MECHANICS LAB 2 |
10 | BVW3214 | MANAGING PRODUCTION AND SUPERVISION |
11 | DMM1921 | MECHANICAL TECHNOLOGY LAB 2 |
12 | DMM3673 | MECHANICAL DESIGN |
13 | DMM2931 | MECHANICAL TECHNOLOGY LAB 3 |
14 | DMM2513 | SOLID MECHANICS |
15 | BMM1511 | ENGINEERING MECHANICS LAB 1 |
16 | DRM1113 | ENGINEERING DRAWING & CAD |
No. | Title | Role | Start Date | End date | Agency | Grant Amount(RM) | Status |
---|---|---|---|---|---|---|---|
1 | Development Of New Patch Shape For Bonded Patch Repair Method | Leader | 20-SEP-2017 | 19-SEP-2019 | GERAN DALAM | 20,000.00 | - |
2 | Dynamical Behavior Of Fiber Metal Laminates By The Free Vibration Method | Member | 30-APR-2018 | 29-JUL-2020 | GERAN DALAM | 33,100.00 | - |
3 | Development Of The Overlay Formulation In Finite Element Model | Member | 15-MAY-2017 | 14-MAY-2019 | GERAN DALAM | 22,000.00 | - |
4 | Development Of Fibre Metal Laminate Materials For Automotive Application | Member | 25-JUN-2016 | 24-JUN-2018 | GERAN DALAM | 33,800.00 | - |
5 | Investigation Into The Intake And Exhaust Flow Performance For A Poppet Valve Two-Stroke Spark Ignition Engine | Member | 25-APR-2016 | 24-APR-2018 | GERAN DALAM | 27,000.00 | - |
6 | Development Of 3d Copier Machine For Non Metal Automotive Part | Member | 15-NOV-2014 | 14-NOV-2016 | GERAN DALAM | 35,060.00 | - |
7 | Optimization Of The Flow Characteristic In Various Array Arrangements Of Multiple Picohydro Power Turbines | Member | 25-APR-2014 | 24-APR-2016 | GERAN DALAM | 19,800.00 | - |
8 | Development Of New Technique To Predict Of Fibers In Short-Fiber Hybrid Composites | Member | 25-JUN-2013 | 24-DEC-2015 | GERAN DALAM | 26,000.00 | - |
9 | Development Of Control System On Android Platform For Micro Hydro Configuration | Member | 15-MAY-2013 | 14-MAY-2015 | GERAN DALAM | 27,400.00 | - |
No | Project | Customer | Start Date | End Date | Project Amount (RM) |
---|
No | Type | Name | Registration No | File Date |
---|
No | Description |
---|
* Data sehingga 11 April 2019
No | Professional Bodies (Association/Other Association) | Start Date | End Date | Level |
---|