1 |
Evaluate The New Technique In Reducing The Feasibility Of Lightning Strikes At A Solar Power Plant |
Leader |
01-JUL-2023 |
30-JUN-2025 |
GERAN DALAM |
38,000.00 |
On-Going |
2 |
Design Of Multi-Factorial Optimization Approach OnSophisticated Meta-Heuristic Algorithm For MaximumPower Point Tracking Of Solar Photovoltaic (Pv) System |
Member |
15-MAR-2025 |
14-MAR-2027 |
PENERBITAN ANTARABANGSA |
40,000.00 |
On-Going |
3 |
Development Of Electrical Isolator Materials Epoxy Resin With High Silica Rice Husk Ash Filler And Silane Reinforced With Vinyl Silane As Coupling Agent And Polyethylene Compatibilizer (Uic241532) |
Member |
30-DEC-2024 |
29-DEC-2025 |
PADANAN ANTARABANGSA |
10,000.00 |
- |
4 |
Development Of Electrical Isolator Materials Epoxy Resin With High Silica Rice Husk Ash Filler And Silane Reinforced With Vinyl Silane As Coupling Agent And Polyethylene Compatibilizer (Rdu242730) |
Member |
30-DEC-2024 |
29-DEC-2025 |
ANTARABANGSA |
10,000.00 |
- |
5 |
Design, Analysis And Assessment Of Large-Scale Solar Photovoltaic Plant In Malaysia For Grid Code Compliance Studies |
Member |
25-DEC-2023 |
24-DEC-2025 |
GERAN DALAM |
29,500.00 |
On-Going |
6 |
A Formulation Of Hybrid Monte-Carlo Simulation And Grey Wolf Optimization For Optimal Distributed Generation Placement And Network Reconfiguration In Future Smart Grid Distribution Networks |
Member |
01-SEP-2022 |
31-AUG-2025 |
FRGS |
110,000.00 |
On-Going |
7 |
Formulation Of New Extended Bat Algorithm For Collision-Free Navigation In Swarm Robots |
Member |
23-DEC-2020 |
22-DEC-2022 |
AGENSI |
20,000.00 |
- |